FAUDI receives the largest single order in the company history
FAUDI GmbH is awarded the contract by the well-known Swabian automobile manufacturer for the supply and installation of the complete filter technology for the production of its gasoline and diesel engines.
Quality
FROM ONE SOURCE
ENGINEERING, MANUFACTURING, SUPPLY AND INSTALLATION OF COMPLETE FILTER TECHNOLOGY FOR THE PRODUCTION OF GASOLINE AND DIESEL ENGINES.
On an area of approx. 50 hectares, a well-known Southern German car manufacturer invested around 500 million euros in a new high-tech engine plant in Poland.
With a project volume of around 15 million euros, this order gives FAUDI the largest single order in its 80-year history.
The total scope of the project consists of several central plants with a total supply capacity of approx. 55,000 litres per minute as well as two storage facilities for the storage and intermediate storage of waste oil and for refilling with fresh oil.
More than 160 machine tools are supplied with oil by the FAUDI filter systems by means of the external pipeline with a length of approx. 3,000 meters which has been specially contoured and installed for this application.
Three FAUDI briquetting presses were also installed to process the valuable production residues (metal chips + oil). The metal chips are briquetted and the oil recovered is fed back into the filter circuit. Due to the valorization of the chips and the recycling of the oil, the payback period is around one year.
The extraordinary praise given to FAUDI by the customer’s management for the performance, technical support, quality and on-time delivery throughout the entire project, has once again confirmed that FAUDI remains true to its basic principles.